What is an S curve in construction?

An “S-Curve” is often used when forecasting the construction component of a development feasibility. An S-Curve is a chart showing construction cash flows over a “standard” project’s life. The graph plots the percentage of value of work completed against the percentage of time completed in small increments.

How do you develop an S curve in project management?

Before the project begins, a planned S Curve can be prepared based on the project schedule. First, a timeline for each project activity is determined. This represents the cumulative progress of that activity against time. Then a weighted average of the progress of all activities is calculated against timeline.

What is the purpose of S curve?

S-curves are great graphical project management tools for planning, monitoring, controlling, analyzing, and forecasting project’s status, progress, & performance. They show the progress of work over time and form a historical record of project trends and variations. S-curves are used for different purposes.

What is baseline S curve?

S-Curves are used to visualize the progress of a project over time. The name is derived from the fact that the data usually takes on an S-shape, with slower progress at the beginning and end of a project. You can analyze baseline, design or actual work, or baseline, design or actual costs.

What are some of the key drawbacks with S curve analysis?

The cause of S-curve drawbacks lies mainly in its lack of tying the schedule and budget to actual project progress. S-curves give little indication as to the cause of variations from projections. The S-curve simply points out deviation of cost in relation to time. It does not relation task completion to time or cost.